January 26-February 22, 2025 Operations Report
/Nick Kluge, Operations Manager
During this period:
● Junk removal and cleanup in maintenance shop
● Cleaned up debris from dock project at the marina
● PM on LISECC work truck performed.
● Repaired broken mower wheel spindle.
● Snow removal
● Weekly DOE discharge monitoring tests
● Cleaned and inspected the WTP reactor
● Received AluPAC8605D
● Jar testing and CSMR analysis of AluPAC8605D
● Monthly and bi-monthly dam inspections
● Monthly distribution system flushing
● Collected water samples for lab analysis for DOH monthly quality compliance
● Cleaned and serviced online chlorine analyser
● Weekly customer leakage survey
● Monthly DOH meeting
● Preparing coagulation report and projections for DOH review prior beginning batch plant trials
● Received gravel delivery
● Helped address/repair customer side leakage at various locations
● Tested the WTP generator
● Continued cleaning and organizing of the maintenance shop and mower shed
Upcoming Projects:
● Repair marina docks
● Mission Communications site visit for SCADA support
● Relocate a customer’s water service connection
● Trial run of AluPAC 8605D coagulant
● Locate and confirm condition of the decommissioned old raw supply pipe
● Repair failing wires on reservoir tank level sensors
● New WTP review w/ Wilson Engineering
● Repair Cabana bathrooms
● Install fish cages in the lakes
● Install Marina cameras
● Install new distribution sampling stations
● Replace old standpipe valves
● Reservoir floating dock
January 2025 Water Production/Usage (in gallons)
Total Water Produced 382,100 Chlorine monitoring (0.178 gpm) 7,946
Flushing 3,000
Metered Usage 234,870
Other (Chlorine residual testing, BW) 2,325 Authorized Consumption 248,141
System Leakage 133,959
Percentage of loss 35.1% Average gallon per minute loss 3.0