December 18, 2025-January 23, 2026 Operations Report
/Nick Kluge, Operations Manager
During this period:
● Justin's new CCCS credential!
● SWSMP document drafting (Source Water Protection, ERP, O&M, WQMP, Inventory, WUE)
● Troubleshooting and investigating filter performance and efficiency
● WTP maintenance (meters, injector pump, rodent proofing)
● Jar tests
● Received new coagulants for tests
● Troubleshooting truck maintenance needs
● Performed maintenance on sweeper/mower/chainsaw
● Groundskeeping and cleared roads of windfall
● Stormdrains cleared
● Storm runoff restoration and road maintenance
● Distribution components inspections
● Monthly/bi-monthly/and annual dam inspections and reporting
● DOE discharge monitoring tests
● Monthly distribution system flushing
● Water samples submitted for DOH monthly quality compliance
● Cleaned and serviced online analyzers
● Weekly customer leakage survey
● Monthly DOH meeting
● Tested the WTP generator
Upcoming Projects:
● Replace work truck
● Decommission old raw water line
● Install new fish cleaning station on marina dock
● Replace sampling stations on Cedar Ave, and at the Island/Beach intersection
● Replace bent standpipe on Island Dr
● PRV vault replacement (seeking bids)
● Community road repairs (seeking bids)
● Install fish cages in the lakes
● Refurbish the Cabana bathrooms
● Install Marina cameras
● Replace old standpipe valves
● Reservoir floating dock
December 2025 Water Production/Usage (in gallons)
Total Water Produced 342,300 Chlorine monitoring (0.178 gpm) 7,946
Flushing 3,300
Metered Usage 228,190
Other (Chlorine residual testing, BW) 2,325 Authorized Consumption 241,761
System Leakage 100,539
Percentage of loss 29.4% Average gallon per minute loss 2.3