February 23-March 21, 2025 Operations Report
/Nick Kluge, Operations Manager
During this period:
● Cleaned out drainage ditches
● Street sweeping various locations
● Located and repaired broken service line
● Removed downed trees from the swim lake
● Assisted member replace a generator using the backhoe
● Cleaned Cabana gutters
● Cleaned Clubhouse
● Truck preventative maintenance and inspection
● Dump/scrap run
● Monthly and bi-monthly dam inspections
● Weekly DOE discharge monitoring tests
● Monthly distribution system flushing
● Collected water samples for lab analysis for DOH monthly quality compliance
● Cleaned and serviced online analyzers
● Weekly customer leakage survey
● Monthly DOH meeting
● Discussion with Kingworks regarding engineering review of the reservoir floating dock
● Tested the WTP generator
● Continued cleaning and organizing of the maintenance shop and mower shed
● Employee annual reviews
Upcoming Projects:
● Repair marina docks
● Mission Communications site visit for SCADA support
● Relocate a customers water service connection
● Trial run of AluPAC 8605D coagulant
● Locate and confirm condition of the decommissioned old raw supply pipe
● Repair failing wires on reservoir tank level sensors
● New WTP review w/ Wilson Engineering
● Repair Cabana bathrooms
● Install fish cages in the lakes
● Install Marina cameras
● Install new distribution sampling stations
● Replace old standpipe valves
● Reservoir floating dock engineering drawings review and permit application
February 2025 Water Production/Usage (in gallons)
Total Water Produced 355,600 Chlorine monitoring (0.178 gpm) 7,177
Flushing 3,000
Metered Usage 189,360
Other (Chlorine residual testing, BW) 2,100 Authorized Consumption 201,637
System Leakage 153,963
Percentage of loss 43.3% Average gallon per minute loss 3.8