November 21-December 27, 2024 Operations Report

Nick Kluge, Operations Manager

During this period:

● Cleaned up tree fall debris from storms

● Inspected and replaced heat lamps under WTP

● Picked up Ferric Sulfate from new supplier in Bellingham

● Recovered lost data from old WTP computers

● Replaced broken back window on LISECC truck

● Weekly customer leakage survey

● Calibration and verifications of online and portable analyzers

● Cleaned and serviced chemical feed pumps, injection quills, and solution day tanks

● Removed the last stop log from Holiday lake

● Cleaned and inspected the WTP reactor

● Septic systems inspected at Clubhouse and Cabana

● Monthly, bi-monthly dam inspections

● Monthly distribution system flushing

● Picked up and installed a spill containment station for chemical storage area

● Picked up additional filter media

● Shipped raw water samples to Alumichem for coagulant testing

● Restored services at WTP after power outage

● Monthly DOH meeting

● Lawn tractor and Backhoe PM performed

● Filter media exchanged and filter vessel inspection

● Replaced WTP backwash valve

● Jar testing

● Cleaning and organizing maintenance shop and mower shed

Upcoming Projects:

● Repair marina docks

● Mission Communications site visit for SCADA support

● Relocate a customers water service connection

● Optimize coagulation and filtration process

● Locate and confirm condition of the decommissioned old raw supply pipe

● New WTP review w/ Wilson Engineering

● Repair Cabana bathrooms

● Install fish cages in the lakes

● Install Marina cameras

● Install new distribution sampling stations

● Replace old standpipe valves

● Reservoir floating dock

November 2024 Water Production/Usage (in gallons)

Total Water Produced 310,800 Chlorine monitoring (0.178 gpm) 7,690
Flushing 3,000
Metered Usage 206,460
Other (Chlorine residual testing, BW) 2,250 Authorized Consumption 219,400
System Leakage 91,400
Percentage of loss 29.4% Average gallon per minute loss 2.1