November 22-December 17, 2025 Operations Report
/Nick Kluge, Operations Manager
During this period:
● SWSMP (drafted new Cross-Connection Control Program)
● Drafted new customer owned water pressure booster equipment contract
● Storm prep
● Lowering Swim Lake water level
● Cleaned drainage ditches and culverts
● Investigating possible filter performance solutions
● CSM&R test for new coagulants
● Cleaned gutters
● Backfilled stormwater runoff areas
● Jar testing
● Troubleshooting filter
● Repairs made on sweeper/mower
● Inspected vaults and PRVs
● Grounds keeping (storm cleanup)
● Monthly and bi-monthly dam inspections
● DOE discharge monitoring tests
● Monthly distribution system flushing
● Water samples for DOH monthly quality compliance
● Cleaned and serviced online analyzers
● Weekly customer leakage survey
● Monthly DOH meeting
● Tested the WTP generator
● Continued scheduling efforts for site visit with Ram for the old raw water line project
Upcoming Projects:
● Winterize Clubhouse. Water turned off (December 1st-March 1st)
● Update SWSMP
● Install new fish cleaning station on marina dock
● Replace sampling stations on Cedar Ave, and at the Island/Beach intersection
● Replace bent standpipe on Island Dr
● PRV vault replacement (seeking bids)
● Community road repairs (seeking bids)
● Install fish cages in the lakes
● Refurbish the Cabana bathrooms
● Install Marina cameras
● Replace old standpipe valves
● Reservoir floating dock
November 2025 Water Production/Usage (in gallons)
Total Water Produced 321,100 Chlorine monitoring (0.178 gpm) 7,690
Flushing 3,000
Metered Usage 223,010
Other (Chlorine residual testing, BW) 2,250 Authorized Consumption 235,950
System Leakage 85,150
Percentage of loss 26.5% Average gallon per minute loss 2.0