March 2017 Operations Report
/Operations report for March 2017
Water Usage
Pumped 377,920
Backwashes 51,150
Net pumped 326,770
The docks will be deployed Monday, May 1 and Tuesday, May 2 due to tidal conditions. The boat ramp will not be available to members on those days.
Chart recorder for the CL17 failed. New chart recorder is $1000 plus shipping and handling.
Isaac set to take his exams at the end of the month. As Department of Health requires a shift position to have 12 months experience, LISECC will need to inform DOH that we intend to apply for a waiver before John retires.
Kevin is scheduled to take the Cross Connection Control test at the end of the month.
Kevin's telephone is dying, he will need a new basic flip phone.