April 2017 Operations Report
/
Water Usage
Pumped 346,700
Backwashes 49,500
Net pumped 297,200
We have had some minor vandalism at the marina. We have locked everything up for the week.
The docks have beeninstalled for the summer
The roof on the clubhouse has been completed.
We will be starting to paint the decks and railing at the clubhouse this summer.
The training continues . Isaac has passed his first test, is preparing to attend training in June and take his level two tests this summer. I have recommended he also take the training and the test for cross connection control specialist this summer.