May 20-June 21, 2024 Operations Report

Nick Kluge, Operations Manager

During this period:

  • DOH technical assistance onsite visit

  • Retrieved past vegetation, topo and bathymetry survey of Dickinson Lake

  • Groundskeeping at various locations

  • Cabana renovation project

  • Calibration and verifications of online analyzers

  • Jar testing alternative coagulants and filter aids

  • Monthly, bi-monthly and weekly dam inspections completed

  • Sonde calibration/verification

  • Sourced services to provide engineer stamped approval of reservoir floating dock

  • Sourced services to provide wetland survey for HPA

  • Meeting with NW Technology to provide IT support via service agreement

  • Meeting with Elm Electric for bid on swimlake electrical addon for aerator fountains

  • Leakage surveying

  • 2023 Water Use Survey

  • 2023 Consumer Confidence Report

  • DOH monthly meeting

  • Installed new white board on maintenance shop

Upcoming Projects:

  • Optimize coagulation and filtration process Ongoing

  • Continue leak detection and distribution repairs Ongoing

  • New WTP review w/ Wilson Engineering Ongoing

  • Repair Cabana bathrooms Ongoing

  • Install Marina aluminum docks July 1, 2024

  • Install Marina cameras July, 2024

  • Install new distribution sampling stations Summer, 2024

  • Reservoir floating dock Summer, 2024

  • Filter media replacement Summer, 2024

May 2024 Water Usage (in gallons)

Total Water Produced 412,500 Chlorine monitoring (0.178 gpm) 7,646
Flushing 3,000
Metered Usage 261,900
Other (Chlorine residual testing, BW) 31,525 Authorized Consumption 304,371
System Leakage 108,129
Percentage of loss 26.2% Average gallon per minute loss 2.4

May 20-June 21, 2024 Lab Analysis Results