May 20-June 21, 2024 Operations Report
/Nick Kluge, Operations Manager
During this period:
DOH technical assistance onsite visit
Retrieved past vegetation, topo and bathymetry survey of Dickinson Lake
Groundskeeping at various locations
Cabana renovation project
Calibration and verifications of online analyzers
Jar testing alternative coagulants and filter aids
Monthly, bi-monthly and weekly dam inspections completed
Sonde calibration/verification
Sourced services to provide engineer stamped approval of reservoir floating dock
Sourced services to provide wetland survey for HPA
Meeting with NW Technology to provide IT support via service agreement
Meeting with Elm Electric for bid on swimlake electrical addon for aerator fountains
Leakage surveying
2023 Water Use Survey
2023 Consumer Confidence Report
DOH monthly meeting
Installed new white board on maintenance shop
Upcoming Projects:
Optimize coagulation and filtration process Ongoing
Continue leak detection and distribution repairs Ongoing
New WTP review w/ Wilson Engineering Ongoing
Repair Cabana bathrooms Ongoing
Install Marina aluminum docks July 1, 2024
Install Marina cameras July, 2024
Install new distribution sampling stations Summer, 2024
Reservoir floating dock Summer, 2024
Filter media replacement Summer, 2024
May 2024 Water Usage (in gallons)
Total Water Produced 412,500 Chlorine monitoring (0.178 gpm) 7,646
Flushing 3,000
Metered Usage 261,900
Other (Chlorine residual testing, BW) 31,525 Authorized Consumption 304,371
System Leakage 108,129
Percentage of loss 26.2% Average gallon per minute loss 2.4