April 27-May 19, 2024 Operations Report
/Kevin Southworth, Operations Manager
During this period:
Launched Marina main docks
Repaired pull tabs on main docks
Dickinson Lake underwater dam face inspection for DOE Dam Safety
Cabana plumbing repairs
Removed damaged sample station from Island Dr.
Employee evaluations
Re-coded Clubhouse door lock
Groundskeeping
Pond weed removal research and bid request
Restocked supplies for dry dock
Leakage surveying
Jar testing
Filter performance trouble-shooting
Maintenance shop inventory
Wilson Engineering review
DOH monthly meeting
Upcoming Projects:
Optimize coagulation and filtration process Ongoing
Continue leak detection and distribution repairs Ongoing
New WTP review w/ Wilson Engineering Ongoing
Repair Cabana bathrooms Ongoing
Install gap covers on marina dock sections Summer, 2024
Install Marina cameras May-June, 2024
Install new distribution sampling stations May-June, 2024
Reservoir floating dock Summer, 2024
Filter media replacement Summer, 2024
April 2024 Water Usage (in gallons)
Total Water Produced 435,300 Chlorine monitoring (0.178 gpm) 7,690
Flushing 3,000
Metered Usage 242,860
Other (Chlorine residual testing, BW) 130,080 Authorized Consumption 383,630
System Leakage 51,670
Percentage of loss 11.9% Average gallon per minute loss 1.2