April 27-May 19, 2024 Operations Report

Kevin Southworth, Operations Manager

During this period:

  • Launched Marina main docks

  • Repaired pull tabs on main docks

  • Dickinson Lake underwater dam face inspection for DOE Dam Safety

  • Cabana plumbing repairs

  • Removed damaged sample station from Island Dr.

  • Employee evaluations

  • Re-coded Clubhouse door lock

  • Groundskeeping

  • Pond weed removal research and bid request

  • Restocked supplies for dry dock

  • Leakage surveying

  • Jar testing

  • Filter performance trouble-shooting

  • Maintenance shop inventory

  • Wilson Engineering review

  • DOH monthly meeting

Upcoming Projects:

  • Optimize coagulation and filtration process Ongoing

  • Continue leak detection and distribution repairs Ongoing

  • New WTP review w/ Wilson Engineering Ongoing

  • Repair Cabana bathrooms Ongoing

  • Install gap covers on marina dock sections Summer, 2024

  • Install Marina cameras May-June, 2024

  • Install new distribution sampling stations May-June, 2024

  • Reservoir floating dock Summer, 2024

  • Filter media replacement Summer, 2024

April 2024 Water Usage (in gallons)

Total Water Produced 435,300 Chlorine monitoring (0.178 gpm) 7,690
Flushing 3,000
Metered Usage 242,860
Other (Chlorine residual testing, BW) 130,080 Authorized Consumption 383,630
System Leakage 51,670
Percentage of loss 11.9% Average gallon per minute loss 1.2