March 23-April 26, 2024 Operations Report
/Kevin Southworth, Operations Manager
During this period:
Reservoir tank cleaning and inspection
Cabana bathroom floor and frost damage repair
Prepping Clubhouse for reopen
Groundskeeping
CL-10, pH, 2100Q, TU5300, 1720e calibration
New calibration standards for Sonde placed on order
Leakage surveying
Restock supplies in preparation for dry dock
Jar testing
Filter performance trouble-shooting
PM on work truck
Maintenance shop organizing
Wilson Engineering review
DOH monthly meeting
Upcoming Projects:
Optimize coagulation and filtration process Ongoing
Continue leak detection and distribution repairs Ongoing
New WTP review w/ Wilson Engineering Ongoing
Repair Cabana bathrooms April, 2024
Install gap covers on marina dock sections April-May, 2024
Install Marina cameras April-May, 2024
Launch Marina Docks May, 2024
Install new distribution sampling stations May, 2024
Reservoir floating dock Summer, 2024
Filter media replacement Summer, 2024
February 2024 Water Usage (in gallons)
Total Water Produced 433,500 Chlorine monitoring (0.178 gpm) 7,946
Flushing 3,000
Metered Usage 255,319
Other (Chlorine residual testing, BW) 64,479 Authorized Consumption 330,744
System Leakage 102,756
Percentage of loss 23.7% Average gallon per minute loss 2.3