October 21-November 16, 2023 Operations Report
/Kevin Southworth, Operations Manager
During this period:
Buried exposed water services in preparation for winter
Leakage surveying
Replaced refrigerator in Clubhouse
Flushing Section 2
Dag waste bag pole install
Made a filter expansion tool
Filter maintenance and troubleshooting
Annual DOE dam inspections
Surveying for Wilson Engineering and DOE dam safety
Community road sweeping
Grounds keeping
Upcoming Projects:
Jar test new coagulant options and replace filter media
Continue leak detection and distribution repairs
Repair Cabana bathrooms
Electrician to correct the wiring in the Clubhouse and various WTP projects (mid November)
October 2023 Water Usage (in gallons)
Total Water Produced 358,100 Chlorine monitoring (0.178 gpm) 7,946
Flushing 3,000
Metered Usage 238,000
Other (Chlorine residual testing, BW) 2,325 Authorized Consumption 251,271
System Leakage 106,829
Percentage of loss 29.8% Average gallon per minute loss 2.4