September 23-October 20, 2023 Operations Report
/Kevin Southworth, Operations Manager
During this period:
Removed marina docks
Replaced ceiling tiles at Clubhouse
Flushing Section 1
Lowered Holiday Lake level
Updated Dam O & M manual and sent to DOE Dam Safety
Video inspections of both principal outlets from Holiday and Dickenson Lake
Surveying for Wilson Engineering and DOE Dam Safety
WDFW HPA for reservoir dock and pump station
Filter maintenance and troubleshooting
Community road sweeping
Grounds keeping
Upcoming Projects:
Jar test new coagulant options and replace filter media
Establish new WUE Goals and provide membership with public forum for discussion
Continue leak detection and distribution repairs
Repair Cabana bathrooms
Electrician to correct the wiring in the Clubhouse and various WTP projects (mid November)
Finish installing 4 remaining dog waste bag posts
September 2023 Water Usage (in gallons)
Total Water Produced 424,800 Chlorine monitoring (0.178 gpm) 7,690
Flushing 3,000
Metered Usage 318,710
Other (Chlorine residual testing, BW) 2,250 Authorized Consumption 331,650
System Leakage 93,150
Percentage of loss 21.9% Average gallon per minute loss 2.2