September 23-October 20, 2023 Operations Report

Kevin Southworth, Operations Manager

During this period:

  • Removed marina docks

  • Replaced ceiling tiles at Clubhouse

  • Flushing Section 1

  • Lowered Holiday Lake level

  • Updated Dam O & M manual and sent to DOE Dam Safety

  • Video inspections of both principal outlets from Holiday and Dickenson Lake

  • Surveying for Wilson Engineering and DOE Dam Safety

  • WDFW HPA for reservoir dock and pump station

  • Filter maintenance and troubleshooting

  • Community road sweeping

  • Grounds keeping

Upcoming Projects:

  • Jar test new coagulant options and replace filter media

  • Establish new WUE Goals and provide membership with public forum for discussion

  • Continue leak detection and distribution repairs

  • Repair Cabana bathrooms

  • Electrician to correct the wiring in the Clubhouse and various WTP projects (mid November)

  • Finish installing 4 remaining dog waste bag posts

September 2023 Water Usage (in gallons)

Total Water Produced 424,800 Chlorine monitoring (0.178 gpm) 7,690
Flushing 3,000
Metered Usage 318,710
Other (Chlorine residual testing, BW) 2,250 Authorized Consumption 331,650
System Leakage 93,150
Percentage of loss 21.9% Average gallon per minute loss 2.2