February 2018 Operations Report
/Kevin Southworth, Operations Manager
During this month we:
- Removed the old Marina gangway
- Stripped and waxed the Clubhouse floors
- Began prepping the Clubhouse deck for painting
- Repaired pothole on Berry Way
- And Pogozone installed some of the components of the swim lake/storage tanks wi-fi network.
Water Usage (in gallons)
Pumped 384,860
Backwashes 46,200
Net pumped 338,660
Flushing 5,000
Net to distribution 333,600
Residential meters 195,960
Unaccounted for water 137,700
Percentage of loss 41%