March 2018 Operations Report
/Kevin Southworth, Operations Manager
During this month we:
- We removed the old marina gangway and repaired small dock bracket. The new aluminum gangway was installed on March 30.
- The pressure reducing valve (PRV) replacement (at the swim lake spillway) by Blythe was approved. Installation date to be determined once the PRV is ready.
- Master Meter software, used for meter reading and leak detection, was updated to the latest version.
- A water leak was identified and repaired at 2921/2925 Cedar Avenue on March 8. Identifying water leakage is still a high priority.
- Pogozone installed components and CAT-5 cable for the swim lake/storage tanks wi-fi network. Wi-fi project is not complete at this time.
- The Cabana was dewinterized.
- Isaac attended Water System Mapping training on March 12.
Water Usage (in gallons)
Pumped 431,110
Backwashes 51,150
Net pumped 379,960
Flushing 5,000
Net to distribution 374,960
Residential meters 240,820
Unaccounted for water 134,140
Percentage of loss 36%