July 29-August 17, 2023 Operations Report
/Kevin Southworth, Operations Manager
During this period:
Justin Swaen received WTPO-1 certification
Gathered rollers in preparation for dock removal (scheduled for October 1st)
Replaced chemical feed lines in treatment plant
Gathered final bid for reservoir floating dock and gangway
Mowed right of ways and weed eating various locations
Installed depth gauge in swim lake, continued work on DOE Dam action items
Various customer leaks found and addressed
Cleaned Clubhouse gutters, parking lot and deck, sealed chimney
Various DOH, Wilson Engineering and Water Committee meetings
Upcoming Projects:
Establish new WUE Goals and provide membership w/ public forum for discussion
Reservoir floating dock bids review
Continue leak detection and distribution repairs
Repair Cabana bathrooms
Electrician to correct the wiring in the Clubhouse and various WTP projects (pending availability)
July 2023 Water Usage (in gallons)
Total Water Produced 638,300 Chlorine monitoring (0.178 gpm) 7,946
Flushing 3,000
Metered Usage 451,800
Other (Chlorine residual testing, BW) 35,850 Authorized Consumption 498,676
System Leakage 139,624 Percentage of loss 21.9% (1.7% reduction from June) Average gallon per minute loss 3.1