September 17-October 23, 2022 Operations Report
/Kevin Southworth, Operations Manager
During this period:
Flushed section 2
Meeting with Brian regarding WTP location, generator power and details
Repaired generator (bad alternator, regulator, and battery maintainer)
Removed the docks
Surveying at the Clubhouse
Winterized Clubhouse and Cabana
Monthly meeting with DOH
New water service installed at 1250 Island Dr
September 2022 Water Usage (in gallons)
From storage tanks 562,800 Chlorine monitoring feed (0.178 gpm) 7,690
Net to distribution 555,110
Flushing 3,000 Residential meters 348,620
Unaccounted for water 203,490 Percentage of loss 36% Average gallon per minute loss 4.7
Lab results from this period:
Location: SP1, S01 Date: 10/03/22 Total Coliform: Satisfactory, E. Coil: Absent
Dickinson Lake STA 1 2 FT Dickinson Lake STA 1 10 FT Dickinson Lake STA 1 12 FT
Date: 10/06/22 Date: 10/06/22 Date: 10/06/22
Chlorophyll A: 2.36 ug/L Chlorophyll A:1.66 ug/L Chlorophyll A:2.49 ug/L
Pheophytin A: 0.236 ug/L Pheophytin A:0.373 ug/L Pheophytin A: <0.187 ug/L
TSS: ND TSS: ND TSS: ND
Ortho-Phosphate: 0.0066 Ortho-Phosphate: 0.0066 Ortho-Phosphate: 0.0061
Total Phosphorus: 0.014 Total Phosphorus: 0.013 Total Phosphorus: 0.012