March 21-April 18, 2022 Operations Report
/Kevin Southworth, Operations Manager
During this period:
Nick Kluge was hired as a new part-time operator.
Main break on Mt. Vista Dr. repaired, accounting for approximately 2 gallons per minute.
Identified main break near 3015 Hales Passage, awaiting utility location to excavate that area.
The water main on this end of Hales Passage is shut off to minimize water loss.
Continuing to identify the location of a major main break, isolated somewhere near 3051 Hales Passage, approximately 12 gallons per minute.
Coming up:
Large docks scheduled for launch on April 20 to be in place for spring dry dock. Small docks will be deployed later in May.
March 2022 Water Usage (in gallons)
From storage tanks 534,030 Chlorine monitoring feed (0.178 gpm) 7,950
Net to distribution 526,080
Flushing 6,000 Residential meters 241,860
Unaccounted for water 278,220 Percentage of loss 52.9% Average gallon per minute loss 6.2