February 18-March 9, 2020 Operations Report
/Kevin Southworth, Operations Manager
During this period:
Completed draft schematic and as-built plans for Treatment Plant for engineering.
Carl Garrison informed us that he is transitioning away from Coffman Engineering and setting up his own company. This may delay our progress with treatment plant upgrades. We have reached out to Wilson Engineering for an estimate and possible alternative.
Kevin attended Evergreen Rural Water of Washington (ERWOW) conference in Yakima February 25-27.
Pickup truck repairs & maintenance including throttle body replacement and brake shoes/parking brake.
Coordinate with Chris Immer to install large dock connection pins and ramp to small docks.
February 2020 Water Usage (in gallons)
From storage tanks 367,030 Chlorine monitoring feed (0.178 gpm) 7,440
Net to distribution 359,590
Flushing 3,000 Residential meters 208,910 Unaccounted for water 147,680
Percentage of loss 41%