January 19-February 22, 2024 Operations Report

Kevin Southworth, Operations Manager

During this period:

  • Continued troubleshooting filter performance issues

  • Continued filter media profile design R&D w/ DOH and Wilson Engineering

  • Backwash cycle procedure optimization

  • Requested new coagulant chemicals for continued jar testing

  • CL-10, pH, 2100Q, TU5300, 1720e calibration

  • Ordered new static mixer for the reactor

  • Leakage surveying

  • Responded to multiple customer leakage events

  • Replaced multiple meter bodies and receiver heads

  • Successful repair made to water main in the PRV vault at Holiday Lake

  • Post maintenance and routine flushing conducted at multiple locations

  • Boat delivered to Lifestyles Honda in Burlington for warranty service

  • Street sweeping and grounds maintenance

  • Weekly and monthly dam inspections

  • DOH monthly meeting

  • Wilson Engineering meeting

  • Dam safety compliance update with DOE engineers

  • Frost damage plumbing repairs made at Clubhouse

  • Pond weed mitigation meeting scheduled for 3/9/24

  • WCPD pre-application and WDFW HPA submitted for Reservoir dock project

Upcoming Projects:

  • Install Marina cameras (February-March, 2024)

  • Pick up boat from Lifestyles Honda (February-March, 2024)

  • Update and renew DOE WTP general permit (February-March, 2024)

  • Reservoir floating dock (March, 2024)

  • Rebuild raw water feed to include a new static mixer, check valve, and flow meter (March, 2024)

  • Pondweed removal w/ Northwest Aquatic Management (March, 2024)

  • Repair Cabana bathrooms (March-April, 2024)

  • Install new distribution sampling stations (April-May, 2024)

  • Reservoir cleaning w/ Liquivision Technology (Summer, 2024)

  • Filter media replacement (2024)

  • Continue leak detection and distribution repairs (Ongoing)

  • New WTP review w/ Wilson Engineering (Ongoing)

    January 2024 Water Usage (in gallons)

Total Water Produced 483,800 Chlorine monitoring (0.178 gpm) 7,946
Flushing 3,000
Metered Usage 237,960
Other (Chlorine residual testing, BW) 38,955 Authorized Consumption 287,860
System Leakage 195,940
Percentage of loss 40.5% Average gallon per minute loss 4.4