May 20-June 23, 2023 Operations Report
/Kevin Southworth, Operations Manager
During this period:
Located and repaired another distribution leak on Beach Ave.
Docks launched
CCR formatting and review
Flushing section 2
Street sweeping various locations
Mowed right of ways and weed eating various locations
CCC Certification
DOH Sanitary Survey
SDS updated
Cabana showers and hot water turned off for repairs
Onsite pre-design meeting with Wilson Engineering
Upcoming Projects:
Reservoir intake floating dock
Leak detection and distribution repairs
CCR print and mail
Repair leak in the Cabana and repaint floors
Replace mirrors in Cabana restrooms (vandalism from last year)
Repair boat launch ramp
Scheduled the electrician to correct the wiring in the Clubhouse (pending availability)
May 2023 Water Usage (in gallons)
From storage tanks 461,800 Chlorine monitoring feed (0.178 gpm) 7,946
Net to distribution 453,854
Flushing 3,000 Residential meters 286,900
Unaccounted for water 163,954 Percentage of loss 36% Average gallon per minute loss 3.7