May 20-June 23, 2023 Operations Report

Kevin Southworth, Operations Manager

During this period:

  • Located and repaired another distribution leak on Beach Ave.

  • Docks launched

  • CCR formatting and review

  • Flushing section 2

  • Street sweeping various locations

  • Mowed right of ways and weed eating various locations

  • CCC Certification

  • DOH Sanitary Survey

  • SDS updated

  • Cabana showers and hot water turned off for repairs

  • Onsite pre-design meeting with Wilson Engineering

Upcoming Projects:

  • Reservoir intake floating dock

  • Leak detection and distribution repairs

  • CCR print and mail

  • Repair leak in the Cabana and repaint floors

  • Replace mirrors in Cabana restrooms (vandalism from last year)

  • Repair boat launch ramp

  • Scheduled the electrician to correct the wiring in the Clubhouse (pending availability)

May 2023 Water Usage (in gallons)

From storage tanks 461,800 Chlorine monitoring feed (0.178 gpm) 7,946
Net to distribution 453,854
Flushing 3,000 Residential meters 286,900
Unaccounted for water 163,954 Percentage of loss 36% Average gallon per minute loss 3.7

Lab Results from this Period (PDF)